Better Air Quality Onboard

MarineLink.com
Monday, March 17, 2014
Duct Air Treatment in use onboard

Wilhelmsen Ships Service (WSS) has launched a solution to assist shipowners in meeting one of the demands of MLC2006. The Duct Air Treatment, showcased for the first time at APM Singapore this week, is an anti-bacteria block which works within HVAC systems onboard vessels to stop the spread of invisible mould, bacteria and viruses.

Hilde Hvaal Durban, WSS product marketing manager for marine products said, “The block works by sterilizing and sanitizing the entire onboard air conditioning system, including both the air passing through the system and the air handling unit, ducts and diffusers. It is 100% natural with no maintenance or energy costs and is quick and easy to install, with no need for installation equipment or training.”

The cleanliness of onboard air conditioning systems is crucial to the health and well-being of passengers onboard ship and as such, makes up part of the MLC2006.

According to Svenn Jacobsen, WSS Technical Product Manager Refrigeration, marine HVAC systems are ideal breeding grounds for bacteria, viruses and mould and as such, it is vital that they are well maintained: “All mould and yeast spores should be regarded as potentially allergenic. Repeated exposure to high concentrations of spores from any number of species can lead to crew sensitization and in worst cases, acute and chronic health problems. Because the Duct Air Treatment facilitates fast and easy disinfection, it works to prevent the spread of disease onboard and improve air quality significantly.”
 

  • Image taken inside air duct not treated with Duct Air Treatment

    Image taken inside air duct not treated with Duct Air Treatment

Maritime Reporter February 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

New Products

SSI Launches ShipConstructor 2015 R2.1

SSI has today released ShipConstructor 2015 R2.1 software.   The software release comes in response to emerging ship design, engineering and building trends as

Imabari to Construct Newbuilding Dry Dock

In order to accommodate construction of Ultra-Large newbuilding vessels including recently secured 20,000TEU Mega container ships (about 400m in length and about 59m breadth),

Long Beach Port to Boost Power, Speed Clearance

Port of Long Beach Chief Executive Jon Slangerup on Thursday unveiled ambitious plans for congestion-beating smart systems for cargo movement and an all-out

Marine Equipment

Zamakona, Finnish GS-Hydro Ink Deal

The presentation ceremony of the Finnish multinational leader in water services GS-Hydro, new partner of Zamakona Yards in Canarias was held yesterday (January 29th at 7 p.

Naval EXPO Coming to Washington

For the first time ever, the general public will be admitted free to the Naval Future Force Science and Technology EXPO general exhibit hall Feb. 4-5 where they

Kongsberg Expands Louisiana Office, Training Facility

Kongsberg Maritime has purchased approximately 5.2 acres for new construction on an 82,980 sq ft office and training facility. Construction on the James Business

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Salvage Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0988 sec (10 req/sec)