Welland Canal Seaway Tie-up Walls to be Reconstructed

MarineLink.com
Monday, September 30, 2013

The St. Lawrence Seaway Management Corporation (SLSMC) announced today that Oakville based Dufferin Construction has been awarded a contract to replace a series of ship tie-up walls on the Welland Canal. The contract, which entails the removal of the present timber tie-up walls and the construction of new tie-up walls using steel and concrete, is valued at $86 million. The balance of the funding envelope is dedicated to engineering, the purchase of various supplies, and inspection activity.

The tie-up walls to be replaced are located alongside Lock 1 (in the vicinity of Lakeshore Road), Lock 2 (in the vicinity of Carlton Street) and Lock 3 (in the vicinity of the St. Catharines Museum). The work will take place over the next four years, and is slated to begin in early October of this year and conclude in the spring of 2017.

To permit the construction work to proceed, portions of the Welland Canal Parkway Trail (WCPT) that runs alongside the tie-up walls will be closed for periods of time. In addition, portions of the Welland Canals Parkway (commonly referred to as “Canal Road”) will also be closed for periods of time. Signs will be erected along the Canal, to keep the public informed about the activity and the resulting detours. 

Under the current outlook, the project will not impact the flow of traffic crossing any of the bridges that span the Welland Canal.

The Welland Canal is a vital transportation artery within the St. Lawrence Seaway, which serves to connect the Great Lakes to the Atlantic Ocean. The rebuilding of the tie-up walls is one component of a $395 million asset renewal program that the SLSMC is undertaking over the next five years to ensure the continued reliability of the Seaway. Over 227,000 jobs and $35 billion in economic activity are supported by the movement of goods within the Great Lakes / Seaway System.
 

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

OSI to Integrate Software for UK Royal Navy

OSI Maritime Systems (OSI) announced the signing of a contract to integrate its flagship software, ECPINS-W Sub, into the U.K. Royal Navy’s T45 Destroyer Integrated Bridge System (IBS).

HHI to Deploy 3DEXPERIENCE Design Platform

Hyundai Heavy Industries Selects Marine & Offshore Industry Solution Experiences for Design and Engineering of Offshore Structures Dassault Systèmes, the 3DEXPERIENCE Company,

Canadian Icebreaker Refit Contracts Awarded

The Canadian Government informs it has awarded a $6.5 million contract to Babcock Canada Inc. for critical refit work for Canadian Coast Guard ship 'CCGS Louis S.

News

Bayport Dredging a Step Closer; Barbours Cut Pending

The U.S. Army Corps of Engineers has furnished the Port Authority its draft permit for the Bayport Channel Improvement project, Executive Director Roger Guenther

At Hamburg port E-mobility Project, BESIC enters crucial phase

Ten battery-operated heavy goods vehicles now transport containers between ships and the yard at the highly automated handling facility in the HHLA Container Terminal Altenwerder (CTA).

Life Rafts Not Functioning On Sunk Ferry's Sister Ship

South Korean investigators said on Friday that life rafts and escape chutes on a sister ship to a sunken ferry were not working properly. The Sewol ferry, weighing almost 7,

 
 
Maritime Contracts Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1966 sec (5 req/sec)