Gladding Hearn
Gladding Hearn News
Another Ferry Delivered to MBTA in Boston
Glory, the second Incat Crowther designed 27m catamaran ferry built by Gladding Hearn for MBTA of Boston has been delivered following on from sister ship Champion.When Champion was launched late last year, she was the 500th Incat Crowther designed vessel to enter service; Glory takes that number to 529. At the heart of that growth is a range of multi-vessel mass transit projects, such as a quartet of vessels for San Francisco’s WETA and 18 vessels for NYC Ferry in New York.
Gladding-Hearn Delivers Pilot Boat in Virginia
The Virginia Pilot Association has taken delivery of a Chesapeake class MKII launch from Gladding-Hearn Shipbuilding. The MKII, a new generation of the shipyard’s Chesapeake class launch, is the Virginia pilots’ eighth Gladding-Hearn pilot boat.The Somerset, Mass. shipyard has delivered 20 Chesapeake class pilot boats throughout the U.S. since introducing the series in 2003. The latest improvements incorporate the performance benefits of Volvo Penta’s IPS 3 pod system…
Second Fast Ferry Delivered in Massachusetts
The second of two new high-speed catamarans from Gladding-Hearn Shipbuilding has been delivered to the Massachusetts Bay Transit Authority (MBTA).Funded by a grant from the Federal Transit Authority (FTA), M/V Glory will pair with her sister-ship to provide year-round commuter service in Boston Harbor, replacing the high-speed ferries built by the Somerset, Mass. shipyard in 1997.Designed by Incat Crowther…
Gladding-Hearn Begins Rhode Island Ferry Build
Massachusetts based shipbuilder Gladding-Hearn Shipbuilding, Duclos Corporation, said it has begun building a second high-speed passenger ferry for Rhode Island Fast Ferry, Inc., scheduled to be delivered in 2019.The new 320-passenger, all-aluminum catamaran will operate on a new seasonal route between Quonset Point, R.I. and Block Island.The newbuild follows the 2012 delivery of Ava Pearl, the operator’s first high-speed catamaran built by the Somerset…
Gladding Hearn Signs To Build New Coastal Vessel
The Woods Hole Oceanographic Institution (WHOI) and Gladding-Hearn Shipbuilding, Duclos Corporation of Somerset, MA, signed a contract today to build a 60-ft. vessel…
Gladding Hearn Signs To Build New Vessel
The Woods Hole Oceanographic Institution (WHOI) and Gladding-Hearn Shipbuilding, Duclos Corporation of Somerset, Mass. signed a contract to build a 60-ft. vessel to replace the Institution's 46-ft.
Gladding Hearn to Build Ferries for Circle Line
Gladding Hearn Shipbuilding of Somerset, Mass., won the contract to build three new 165-ft., 600-passenger ferries for New York City-based Circle Line. According to Peter Duclos…