Marine Link
Friday, April 26, 2024
SUBSCRIBE

Katherine Faulconer News

05 Dec 2015

NASSCO Delivers Eco Class Tanker to APT

General Dynamics NASSCO, today, delivered the company's first ECO Class tanker, the Lone Star State, to American Petroleum Tankers (APT). The new ECO Class tanker symbolizes the emerging direction of the shipping industry in the U.S. toward cleaner, more fuel-efficient modes of transporting product. The tanker is the first of a five-tanker contract between NASSCO and APT, which calls for the design and construction of five 50,000 deadweight-ton, LNG-conversion-ready product tankers with a 330,000 barrel cargo capacity. The 610-foot-long tankers are a new "ECO" design, offering significantly improved fuel efficiency and the latest environmental protection features including a Ballast Water Treatment System.

19 Oct 2015

General Dynamics NASSCO Christens First ECO Tanker for APT

General Dynamics NASSCO hosted a christening ceremony for the first ECO tanker for American Petroleum Tankers (APT) under construction at the company's shipyard in San Diego. San Diego Mayor Kevin Faulconer spoke at the ceremony, and the ship’s sponsor, Mrs. Helen Downs, christened the ship with the traditional break of a champagne bottle alongside the ship. The ECO tanker, the Lone Star State, is the first of a five-tanker contract between NASSCO and APT, which calls for the design and construction of five 50,000 deadweight ton, LNG-conversion-ready product carriers with a 330,000 barrel cargo capacity. The 610-foot-long tankers are a new “ECO” design, offering improved fuel efficiency and the latest environmental protection features including a Ballast Water Treatment System.

10 Mar 2015

Keel of First Eco Tanker for APT laid

On Saturday, March 7, General Dynamics NASSCO hosted a keel laying ceremony for the first ECO tanker for American Petroleum Tankers (APT) under construction at the company's shipyard in San Diego. San Diego's First Lady, Mrs. Katherine Faulconer, was the honoree for the ceremony. San Diego's First Lady authenticated the keel of the first ECO tanker for APT by welding her initials onto a steel plate during the ceremony. The steel plate with her initials will be permanently affixed to the ship's keel and will remain with the vessel throughout its time in service. Her husband, San Diego Mayor Kevin Faulconer who was present at today's ceremony, cut the first piece of steel used to build the ship during the vessel's start of construction ceremony in September 2014.