KBR awarded FEED for FPSO topsides and hull, Luanda Office to play major role in supplying local content. KBR announce that it has been awarded a FEED contract to perform work for the topsides and hull associated with a new-build, double-sided, single-bottom hull Floating Production Storage and Offloading (FPSO) vessel. The FPSO will be located offshore Angola and FEED is scheduled to start immediately, with a duration of 12 months. KBR’s scope covers the permanently moored FPSO using a spread mooring system. The vessel will be capable of storing a minimum of 1MM BBLS and housing 130 persons on board. The topsides will utilize a single train designed to process 80,000 barrels of oil per day and 90 million standard cubic feet per day at an export pressure of 3,500 psi.