Marine Link
Thursday, April 25, 2024
SUBSCRIBE

Tony Hall News

27 Feb 2013

Welaptega Awarded Rope Inspection in Australia

Welaptega Marine was awarded a contract to inspect the mooring system of the Nganhurra floating production storage and offloading (FPSO) facility operating in waters off the coast of North West Australia. Welaptega has sent a team of specialist engineers to the facility to conduct a Progressive Inspection program using its Rope Measurement System (RMS) and 3D-modeling system (3DM). “Our Progressive inspection philosophy is a guided examination of mooring systems that focuses on known problems and failure modes,” says Tony Hall, President and CEO of Welaptega Marine. Nganhurra FPSO is operated by Woodside Energy Ltd., and is the first oil production facility in the deep waters off the North West Cape.

02 Nov 2012

Mooring Inspection is Critical for Ageing Assets, says Welaptega

Failures of mooring systems in offshore floating production are not easy to predict, but they do occur, and they will happen more often as infrastructure nears the end of design life. “It is mission critical that we do the detective work up front on these ageing systems,” according to Tony Hall, CEO of Welaptega Marine. Hall, whose company specializes in risk-based mooring integrity verification, was speaking today to a group of offshore integrity experts attending a seminar on ageing infrastructure. It was convened by the Oil, Petrochemical and Energy Risk Association (OPERA). “It’s not good enough to do the postmortem on a failure. That’s too late. He said risk-based inspection must be guided by experience of mooring systems and industry best practice.