US House Asks for Lakes Dredge Funds Increase

Posted by Eric Haun
Monday, July 14, 2014
Mike Kelly

The U.S. House of Representatives has sent another clear signal that it is committed to ending the dredging crisis on the Great Lakes, introducing an amendment to the Energy & Water Appropriations bill that mandates that the Great Lakes Navigation System gets the 10 percent of increased funding for dredging that is promised in the Water Resources Reform and Development Act of 2014 that was passed seven weeks ago.

The amendment was co-authored by Congressmen Sean Duffy (R-Wisc.) and Mike Kelly (R-Pa.) and introduced by Rep. Kelly. Duffy represents the Port of Superior, which includes the largest coal-shipping terminal on the Great Lakes, a major iron ore loading facility, other docks and a shipyard.

Kelly’s district includes the port of Erie, which receives hundreds of thousands of tons limestone each year and hosts a major shipyard. Ships servicing Superior and Erie have not been able to carry full loads for decades. Inadequate funding for dredging has left more than 18 million cubic yards of sediment clogging Great Lakes ports and waterways.

“This amendment leaves no doubt that Congress fully intends for the Corps to allocate 10 percent of harbor maintenance funding provided above the 2012 baseline,” said Glen G. Nekvasil, Secretary of Great Lakes Maritime Task Force. “This, plus the increase in Corps funding nationwide passed last week, keeps us moving steadily toward our goal of vessels once again carrying full loads.”

glmtf.org

  • Sean Duffy

    Sean Duffy

Maritime Reporter February 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

News

Zamakona, Finnish GS-Hydro Ink Deal

The presentation ceremony of the Finnish multinational leader in water services GS-Hydro, new partner of Zamakona Yards in Canarias was held yesterday (January 29th at 7 p.

Naval EXPO Coming to Washington

For the first time ever, the general public will be admitted free to the Naval Future Force Science and Technology EXPO general exhibit hall Feb. 4-5 where they

Adani Group Revamps Businesses

Adani Enterprises Limited together with its subsidiaries Adani Ports and Special Economic Zone Limited (“APSEZ”) and Adani Power Limited (“APL”) today announced

Government Update

PHA Budgets $ 275 mi for Capital Improvements

In 2015, the Port of Houston Authority has budgeted $275 million for various capital improvement projects. About $184 million is being allocated to its container

Shippers Must Monitor Greek Government Changes

Moore Stephens says shipping must monitor developments in wake of Greek government change   International accountant and shipping adviser Moore Stephens says

USCG Updates Rules for Arrival/Departure Notices, AIS

Final rule on vessel requirements for Notices of Arrival and Departure and Automatic Identification System published in Federal Register   U.S. Coast Guard (USCG)

Great Lakes

USACE Barges, Tugs Up for Repair

The United States Army Corps of Engineers (USACE) Buffalo District has awarded a repair contract to Great Lakes Shipyard for two tugs and two barges from the Corps’ Cleveland Field Station.

Revisions Proposed for Seaway Practices and Procedures

Under agreement with the U.S. Saint Lawrence Seaway Development Corporation, The St. Lawrence Seaway Management Corporation is proposing to amend the joint Practices

Great Lakes Coal Falls Short in 2014

Despite a nearly 1-million ton increase in coal shipments on the Great Lakes in December, the surge was not enough to enable the trade to outperform 2013, the Lake Carriers’ Association (LCA) said,

 
 
Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2003 sec (5 req/sec)