Marine Link
Friday, April 26, 2024
SUBSCRIBE

Brittin News

17 Jul 2020

USNS Brittin Arrives at Port of Vancouver USA for Extended Stay

USNS Brittin (Photo: Port of Vancouver USA)

U.S. Navy vehicle carrier USNS Brittin arrived at the Port of Vancouver USA Friday for a stay that will last approximately 90 days while the ship undergoes annual maintenance and inspections required by the American Bureau of Shipping (ABS) and the U.S. Coast Guard. The ship and approximately 30-member civilian crew will be docked at the port’s terminals 13 and 14.The USNS Brittin is returning from a six month deployment in the Persian Gulf. The Navy chose the Port of Vancouver…

12 Jul 2002

Northrop Grumman Delivers Another Sealift Ship

USNS Brittin (T-AKR 305), the sixth of seven Bob Hope-class strategic sealift ships being built by Northrop Grumman Corporation's Ship Systems sector, was delivered to the U.S. Navy at the company's Avondale Operations in New Orleans. Participating in the delivery were representatives of the Naval Sea Systems Command (NAVSEA), the supervisor of shipbuilding, conversion and repair, New Orleans, and Ship Systems officials. Delivery took place following Brittin's integrated sea trials, which combined the formerly separate builder's and Navy Acceptance Trials into one evolution. Brittin, and the 150-member Ship Systems integrated trials team, scored the highest grade ever for a strategic sealift ship, and also recorded a rating of "excellent" by Navy inspectors.

06 Sep 2007

BAE Systems Wins Maintenance Contract

BAE Systems has been awarded a contract by Maersk Line, Limited for the drydocking and preservation of the USNS Soderman (T-AKR 317), one of nineteen Military Sealift Command (MSC) Large, Medium-Speed Roll-on/Roll-off (LMSR) Ships. The 55-day work package will begin in mid-September and is valued at $9.3 million, not including options. All work will take place at BAE Systems Ship Repair in Norfolk. BAE Systems will conduct drydocking and underwater work on the Soderman, including maintenance and repairs to propulsion systems and machinery, and preservation of the vessel’s hull, tanks and topside areas. Additionally, the contract includes ship security upgrades…

06 Jul 2007

BAE Wins Overhaul Contract

BAE Systems won a contract by the U.S. Navy's Military Sealift Fleet Support Command for a 60-day overhaul of the fast combat support ship USNS Arctic (T-AOE 8). The contract includes options which, if exercised, would bring the cumulative value of the work package to $7.9 million. All work on the Military Sealift Command ship will be performed at BAE Systems Norfolk Ship Repair starting in July and is expected to be completed in September 2007. USNS Arctic's primary mission is to rapidly replenish Navy task forces and carry more than 177,000 barrels of oil; 2,150 tons of ammunition; 500 tons of dry stores; and 250 tons of refrigerated stores.

19 Jul 2001

Sealift Ship To Be Christened Benavidez At Avondale

The seventh and final Strategic Sealift ship in the BOB HOPE Class will be christened BENAVIDEZ in ceremonies at the Northrop Grumman Corporation Avondale shipyard Saturday, July 21, 2001, beginning at 10 a.m. The new ship will be named in honor of Medal of Honor recipient Army Master Sgt. Roy P. Benavidez, of Lindenau, Tex. Benavidez distinguished himself in a series of daring and extremely valorous actions while in the Republic of Vietnam assigned to Detachment B56, 5th Special Forces Group (Airborne), 1st Special Forces, U.S. Army. On May 2, 1968, while a Staff Sgt., Benavidez voluntarily led the emergency extraction of a 12-man special…