Parker Bestobell Marine has received its first order to supply its cryogenic fuel gas valves for new build tankers. The two 15,000-dwt ice-class 1A asphalt and bitumen tankers have been ordered by Groupe Desgagnés of Canada and will be built at Besiktas shipyard in Turkey. The ships will be equipped with dual-fuel engines allowing them to operate on LNG (Liquefied Natural Gas) and fuel oil, via 600 cbm gas storage tanks on the decks. Once built, the vessels will serve the Great Lakes and Canada’s St. Lawrence River.