Enerpac Lifting Accuracy Enables Pioneering Spirit Fast Lift
Enerpac informs it has supplied the high pressure, hydraulic cylinder technology for the topsides lift system beams aboard Allseas’ massive platform installation/decommissioning and pipelay vessel, Pioneering Spirit. The cylinders are an integral part of the vessel’s lift system, enabling the installation and decommissioning of complete topsides weighing up to 48,000 metric tons, Enerpac explained. Pioneering Spirit’s 16 lifting beams feature 64 Enerpac CLRG-Series high tonnage double acting hydraulic cylinders arranged in groups of four.
Enerpac Takes the Load for Lamprell Jack-Up Rig
High-pressure hydraulics specialist, Enerpac, with its official distributor Al Masaood Trading, Dubai, has supplied Lamprell, a provider of diversified fabrication, engineering and contracting services to the onshore and offshore energy industries, with an EVO-Series Synchronous Lifting System to weigh a newly completed jack-up rig. The Enerpac multifunctional synchronous lifting EVO system monitors and manages lifting, lowering, weighing, alignment and load transfer procedures of non-uniform distributed heavy loads.
Transformers Safely, Precisely Handling Costly Freight
An Enerpac EVO synchronous lifting system has helped save a transformer manufacturer hundreds of thousands of dollars in freight from New Zealand to India by safely and precisely weighing the electrical equipment to exactly verify that its tonnage came in under local shipping port weight limits. The hydraulic 12-point lifting, shifting and weighing system was deployed by New Zealand and international logistics and machinery moving specialists Machinery Movers Ltd to assist with their delicate challenge in Northland, New Zealand.
LGH Now Offering Hydra-Slide
Lifting Gear Hire (LGH) announced a new addition to its rental fleet: the HT500, a jack and slide system manufactured by Hydra-Slide. LGH will offer the 500-ton capacity hydraulically powered Hydra-Slide Heavy Track Skidding System (HT500) as it has been shown to be one of the most cost-effective and accurate methods for moving, loading or unloading all types of heavy loads. The new system will include 50 feet of double track (8” height) and four skid shoes. The track will come in 10’ and 15’ sections and is interconnected by simple pin connections.