GCT Deltaport Grows Capacity with Konecranes RTGs
Complementing its GCT Deltaport Intermodal Yard Reconfiguration project in Port Metro Vancouver, GCT Canada has confirmed the order of twelve state-of-the-art rubber tyred gantry (“RTG”) cranes from leading clean energy equipment manufacturer, Konecranes of Finland. The new equipment will boost yard velocity at the country’s flagship container terminal, densifying container handling with the RTGs’ 1-over-5 high and 40 LT lifting capacity. The RTGs will join an advanced equipment fleet equipping GCT Deltaport to be big ship ready…
GCT Deltaport is ‘Big Ship Ready’
Following breaking ground on its CAD$280 million GCT Deltaport Intermodal Yard Reconfiguration project in Port Metro Vancouver, GCT Canada has confirmed the order of two high-efficiency “megamax” ship-to-shore (STS) cranes from crane manufacturer Shanghai Zhenhua Heavy Industries Co., Ltd. (ZPMC). Boasting a 23+ container wide outreach, the STS cranes will be capable of handling the largest vessels in service worldwide. Upon commissioning, the state-of-the-art cranes will be among the largest in the Americas, standing over 137 meters high, with a lift capacity of 65 metric tons.
Konecranes RTG for GCT Deltaport
In March 2015, Konecranes received an order for four Rubber Tired Gantry (RTG) cranes from GCT Canada Limited Partnership for its GCT Deltaport facility located in Port Metro Vancouver, Canada. Destined for the country’s flagship container terminal, this will be Konecranes’ first RTG delivery to the West Coast of Canada. The cranes will be delivered fully-erect in the spring of 2016. The CSA-approved, hydraulics-free Konecranes RTGs on order are 16-wheel machines with a lifting capacity of 40 LT, lifting 1-over-5 high and 7-plus-truck lane wide. They will be equipped with a Tier 4f diesel genset and Konecranes’ Diesel Fuel Saver technology. The RTGs will also be equipped with Konecranes’ Active Load Control system, which eliminates container sway to increase container handling performance.