The first unique LNG powered ship that Ferus Smit has on order for Erik Thun A.B. will be built and equipped as a dedicated cement carrier. The ship will be delivered to the joint venture JT cement, in which Erik Thun AB cooperates with KG Jebsen Cement from Norway. There is an option for a second vessel of the same design. The vessels cargo system will consist of a fully automated cement loading and unloading system, based on fluidization of cement by means of compressed air. The cargo system is designed and delivered by KGJ cement, a company also part of the KG Jebsen group.