Marine Link
Sunday, March 15, 2026

Ssl System News

29 Aug 2017

Trelleborg Suite Supplied to Prelude FLNG

Prelude FLNG (Photo: Trelleborg)

Trelleborg’s marine systems operation has supplied a suite of products to Shell’s Prelude FLNG facility, the largest offshore facility ever constructed. Prelude, which is 488 meters long, 74 meters wide, and made with more than 260,000 tons of steel, will extract and liquefy natural gas from a site in North West Australia. Trelleborg supplied its gas transfer technology and SafePilot navigational and piloting systems for Prelude. “Our SafePilot solution, SSL, ESL and radio ESD for tandem condensate offload have been used on Shell’s Prelude FLNG…

20 Jan 2016

Trelleborg Ships its 600th LNG Ship Shore Link

Photo: Trelleborg

Trelleborg’s marine systems operation has passed a milestone with the shipment of its 600th SeaTechnik Ship Shore Link (SSL) system for the Liquefied Natural Gas (LNG) Industry. The SeaTechnik SMART SSL system will be installed on a 174,000m3 LNG Carrier (Hull number 2411), being built by Daewoo Shipbuilding & Marine Engineering (DSME) at its Okpo ship yard, Goeje Island, South Korea, for Teekay shipping Limited. The majority of the world’s LNG cargo fleet and terminals are equipped with SSL technology…

03 Nov 2014

LNG on the Rise

As the world’s economies search for sustainable, reliable, renewable energy sources, they are also more closely examining a range of fossil fuels to find the cleanest, least harmful of those to cut carbon emissions and improve air quality in the process. In the drive to cut carbon emissions, interest in liquefied natural gas (LNG) is growing. LNG is being looked at not only as fuel for generating electricity and heat, but also as a fuel for powering marine vessels, road vehicles and trains. With the recent development of abundant shale gas deposits in the United States, the LNG market is really set to take off. The common method for transporting natural gas worldwide is to liquefy it so it takes up less volume and can be transported in specialized LNG carrier vessels.

25 Mar 2013

Trelleborg to Supply Equipment to Yeudong LNG Terminal

Trelleborg Marine Systems has been awarded the contract to supply docking and mooring equipment and LNG cargo transfer technology for the new Yuedong LNG Terminal in China. After working closely with project owner, CNOOC Yuedong LNG, Trelleborg was chosen to supply the project’s LNG terminal with a fully integrated large-scale LNG mooring and transfer system thanks to its ability to provide an industry leading range of products, systems integration and end-to-end support. The range of equipment supplied by Trelleborg includes Double and Triple Quick Release Hooks with hazardous area compliance, SmartHook  Mooring Load Monitoring Systems with electric remote release…