From 28 November 2014 to 28 May 2015, work will be carried out for the construction of a jetty near Lorong Halus Jetty. Construction of the jetty will be carried out by piling barge, crane barges and work barges with the support of tug boats. Test piles will be installed by using testing method. This is followed by the permanent marine pile which will be installed by the piling barge or crane barges. Reinforcement work will be followed by pile cutting and pile head treatment before the head stock. Once the reinforcement concrete work is completed, the steel walkway will be installed to connect each of the jetty structure. Craft involved in the works will exhibit the appropriate local and international day and night signals.