Marine Link
Saturday, December 14, 2024

Johan Sverdrup Contract to "Pioneering Spirit"

Maritime Activity Reports, Inc.

March 2, 2015

Statoil has signed a contract with Allseas for installation of three platform topsides on the Johan Sverdrup field.

 

The vessel will be installing the topsides for the drilling, processing and living quarter platforms.Allseas will transfer the topsides to Pioneering Spirit before they are transported to the Johan Sverdrup field. On the field Pioneering Spirit will install the topside on the steel jackets.

The drilling platform topsides will be installed in 2018, and the processing and living quarter topsides will follow in 2019.

The vessel has a lifting capacity of 48,000 tons. The heaviest lift will be carried out during installation of the processing platform topside that weighs around 26,000 tons.

After the topsides have been assembled onshore they will be transported offshore for installation. This allows more work related to completion and testing of the topsides to be performed onshore. The number of offshore man-hours will be reduced, which reduces both time and costs.

Constructed in South Korea, ”Pioneering Spirit” is currently being completed in Rotterdam.

This contract award is subject to the Norwegian parliament’s approval of the plan for development and operation of the Johan Sverdrup field in 2015.

Subscribe for
Maritime Reporter E-News

Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email five times per week