VT Halter reportedly won the Phase II contract with the U.S. Navy to build three fast missile ships for the Egyptian Navy when it was awarded a $41.5 million modification to a previously awarded contract, according to a report on www.gulflive.com.
The modification is for long lead-time materials relating to the command and control systems for the three ships. The efforts required include all hardware, software, licensing, design engineering, production engineering, manufacturing, test engineering, technical documentation, and program management through factory acceptance testing and shipyard delivery of each respective system. (Source: www.gulflive.com)