Ships' lifting Apparatus at Abu Dhabi Ports
Abu Dhabi Ports have informed that they reserves the right to refuse the use of ships' lifting apparatus without valid certification and / or if the apparatus is assessed by the HSE inspectors to be substandard due to, amongst other things:
- Crane malfunctions that includes the crane hydronic system and pneumatic system.
- Outreach of crane is not fulfilling the operational requirement.
- Failure in control systems.
- Failure in emergency stop function.
- Failure of crane wire / cable.
- Power supply problems / potential problems.
- Corrosion / Long-term abrasion.
- Bent or cracked hooks.
- Absence of hook safety latch.
If a ship's lifting apparatus is rejected, the ship agent will be requested to use the available mobile shore cranes of Abu Dhabi Ports.
Source: Abu Dhabi Ports