MacGregor is scheduled to retrofit three sets of flood control doors to a RoPax freight carrier constructed in 1990. The flood control barrier system from MacGregor includes the retrofit of three sets of single-section top-hinged flood control doors. MacGregor's specialists will perform this work during the vessel's docking from September - November of this year.