MacGregor Inks Hatch Cover Deal
MacGregor was selected to deliver a comprehensive scope of cargo handling solutions for six 1,700 TEU dual-fuel LNG-powered containerships to be built at Cochin Shipyard Limited (CSL) in India. The vessels are being built for the CMA CGM. The six 1,700 TEU vessels are scheduled for delivery between 2029 and 2031. They will support and reinforce Indiaâs role as a strategic hub for global trade and sustainable shipbuilding.The order was booked to MacGregorâs Q2 2026 orders received.The extensive scope of supply includes the design and key componentsâŠ
Libra-Plast to Provide Doors, Hatches for Damen Naval PES Project
Damen Naval has signed a procurement contract with Libra-Plast AS in Norway for the delivery of all watertight, weathertight and gastight doors and hatches for the PES project. Under this project, a Damen SIGMA frigate will be built by COTECAR at its shipyard in Cartagena.Libra-Plast will be able to meet the quality standards and requirements needed for the PES frigate.