Marine Link
Tuesday, April 16, 2024
SUBSCRIBE

Oil Recovery Vessels News

16 Mar 2022

Jan De Nul, W&O Ink Marine Valve Deal

Photo courtesy Jan De Nul

W&O signed a new supply agreement with Jan De Nul Group, a leading civil engineering and dredging companies, a deal which expands upon the existing 10-year relationship and will see W&O supply marine valves and instrumentation to Jan De Nul Group.The two-year supply aims to ensure product availability, a fixed price, and, when needed, technical advice for upcoming drydocks or special refit projects. Jan De Nul is one of the largest marine contractors in the world, operating a fleet of more than 80 dredging and offshore installation vessels in many remote areas across the world.

11 Sep 2019

Vestdavit to Equip Norwegian CG Vessels

Photo courtesy of Vestdavit

Vestdavit secured an order to supply three new Norwegian Coast Guard vessels with davits equipped for polar conditions, in a project which also calls for installation of a deck-mounted transfer system for rapid deployment.The ships are being built by Vard Group within the P6615 project to replace Nordkapp-class ships with a new generation of search-and-rescue, surveillance, and oil recovery vessels. The 136m length newbuildings have been developed for worldwide operations including arctic areas and will feature ice-strengthened hulls and ice-class notation on their delivery from Vard Langsten…

21 Jan 2020

Shipyard Coatings: Green is the Best Color

VT Halter’s new state-of-the-art blast and paint facility, already paying dividends for the shipyard’s bottom line and the environment alike, is poised to lift your bottom line with improved coatings and reduced corrosion.When it comes to marine coatings, preparation is everything. If that’s the case, then Gulf Coast-based VT Halter has all the boxes checked when it come to making sure that every vessel component and exposed surface that leaves its facility is ready for whatever harsh conditions come next. That’s because, in April of 2018, VT Halter Marine unveiled a state-of-the-art blast and paint facility that today allow ship sections to be prepared, blasted and painted in a controlled environment.

27 Jun 2017

Maritime Broadband Radio: First Wireless Network at Sea

Maritime Broadband Radio, MBR, is also installed on the Coastal Administration’s surveillance plane LN- KYV. (Photo: Kongsberg Seatex AS)

Norway has become the first nation to implement maritime broadband communication on ships and planes in public service, enabling exchange of information that can be crucial in limiting damage when accidents occur. Kongsberg Seatex and Radionor have teamed up to develop Maritime Broadband Radio (MBR), which the Norwegian companies say is, in contrast to previous systems, highly stable and has extensive reach. Among other capabilities, MBR also enables streaming of HD-video. MBR does not require an internet connection to connect units in the network…

09 Apr 2016

VT Halter Launches Tug for Bouchard

VT Halter Marine, Inc. (VT Halter Marine), a company of Vision Technologies Systems, Inc. (VT Systems), announces the launch of the M/V Frederick E. Bouchard, at its Moss Point Marine Shipyard Facility in Escatawpa, Mississippi on Thursday, March 31, 2016. M/V Frederick E. Bouchard is the second of two 6,000hp Twin Screw Articulated (ATB) tugs constructed for Bouchard Transportation Co. Inc. (Bouchard Transportation) under a two-vessel contract awarded to VT Halter Marine in August 2014. Both M/V Frederick E. Bouchard and the M/V Morton S. Bouchard Jr. measures, 130 feet by 38 feet by 22 feet, are classed by ABS as A1 Ocean Towing, Dual Mode ATB, USCG Subchapter C, and is equipped with an Intercon Coupler System.

23 Mar 2015

MacGregor's Deck Equipment for Chinese Shipbuilder

MacGregor, part of Cargotec, has won a contract from Chinese shipbuilder Wuhu Xinlian to supply two complete deck equipment packages for a pair of 78m anchor handling, supply and oil recovery vessels. The MacGregor equipment will be installed on the 12,000 bhp, 150 tonne bollard pull vessels under construction for Sentinel Offshore (L) Limited. Equipment delivery is scheduled during August and September 2015. The contract follows a similar order from Wuhu Xinlian placed in August 2014, to supply full packages of MacGregor AHTS equipment for two 150 tonne bollard pull AHTS/oil recovery vessels. "This new order from Wuhu Xinlian is a great endorsement for the range and quality of our equipment…

05 Mar 2015

MacGregor Wins Chinese Shipyard Order

MacGregor, part of Cargotec, has received an order from Wuhu Xinlian Shipyard in China for eight MacGregor dry bulk cement handling systems. The fully automated pneumatic systems will be installed on two 78m 12,000 bhp 150T BP anchor handling, tug, supply and oil recovery vessels and six 79m 4,000 dwt platform supply vessels. The contract includes system design and the delivery of key components, which will take place between August 2015 and January 2016. "The customer chose MacGregor's pneumatic dry bulk handling system because it offers high functionality and excellent reliability, important benefits supported by testimonials from other satisfied customers," says Francis Wong, head of Sales and Marketing at MacGregor Offshore Deck Machinery.

21 Nov 2014

MacGregor's Hatlapa Brand is 95 Today

November 2014 marks the 95th anniversary of MacGregor's Hatlapa brand. Since its foundation in 1919 by German engineer Max Hatlapa, the formerly independent Uetersen-based company has strived for engineering excellence. Last year, in recognition of these qualities and the benefits that Hatlapa offers, MacGregor purchased the company to complement its offering to the merchant shipping and offshore customers. "Over the years, Hatlapa has won a worldwide reputation for quality German-engineered products," says Alexander Nürnberg, who was previously Managing Partner of Hatlapa Uetersener Maschinenfabrik GmbH & Co. KG and today heads the new Auxiliary and Machinery Systems Division at MacGregor.

17 Aug 2014

MacGregor's AHTs Equipment Package for Wuhu Xinlian

MacGregor, part of Cargotec, has got an order from Wuhu Xinlian shipyard in China to supply a full package of MacGregor anchor handling tug supply (AHTS) equipment to two 150-tonne bollard pull AHTS/oil recovery vessels. The equipment is scheduled for delivery by May 2015 and an option remains for two more ship sets. "The contract was won as a direct result of MacGregor's recently extended product portfolio and its ability to offer competitive and highly technical advanced technology with strong lifetime support worldwide," says Francis Wong, Vice President, Segment Sales, Offshore. The scope of MacGregor equipment includes a medium-pressure anchor windlass/mooring winch, capstans, tugger winches, storage reels and a power pack.

22 Nov 2013

Incat Crowther Opens Brazil Office

One of 12 48m Monohull UT4000 FSVs under construction at ETP Engerharia

Incat Crowther announced the opening of an office in Rio De Janeiro, Brazil, created to meet the growing demand for Incat Crowther’s products and services in South America while placing Incat Crowther at the center of the South American Offshore Oilfield industry. The Incat Crowther Group said it has experienced significant international growth as a result of a track record of diverse vessel designs and unique consulting services. The office in Brazil is a reflection of this growth and will initially target specialized high speed aluminum ships for the local offshore support market.

14 Nov 2013

China's CNOOC Place Large Scana OSV Propulsion Systems Order

Image courtesy of Scana Propulsion

Scana Industrier has through its Norway-based subsidiary Scana Propulsion signed contracts with a value around 50 million NOK in second half 2013. The orders are related to delivery of propulsion systems for offshore vessels within China. The contracts are signed with companies within the CNOOC group and includes delivery of gear, propellers, remote controlling and tunnel thrusters for Anchor Handling Supply Vessels and Oil Recovery Vessels. Delivery will be during second quarter 2014.

21 May 2013

TY Offshore Launches Eighth of Eighteen FMT Industries Barges

Photo: TY Offshore

TY Offshore, LLC launched the FMT 3256, the eighth of eighteen 297’6” x 54’ x 12’, 30,000 barrel tank barges for FMT Industries, LLC, one of the several companies within the Florida Marine Group. FMT Industries recently exercised its option for four additional barges from its original order of ten. The barges are being built at TY Offshore’s Gulfport, Mississippi facility. Additional barge launches will follow at thirty day intervals. •Total of six Harvey Gulf International 302’ x 64’ (92m x 19.5m) Dual Fuel Supply Vessels…

17 Dec 2012

Tank Barge Launched for TY Offshore

TY Barge Launch: Photo credit TY Offshore

TY Offshore Launches FMT 3248, the fourth of fourteen FMT Industries Barges built at TY's Gulfport, Mississippi facility. TY Offshore, LLC announce the launch of FMT 3248, the fourth of fourteen 297’6” x 54’ x 12’, 30,000 barrel tank barges for FMT Industries, LLC, one of the several companies within the Florida Marine Group (Florida Marine). FMT Industries has recently exercised its option for four additional barges from its original order of ten. Additional barge launches follow on at thirty day intervals.

15 Mar 2011

Anchor-handling Capabilities Secure New Order For Cargotec

Cargotec has won a contract to supply two sets of MacGregor anchor-handling systems for two anchor-handling tug /supply / oil recovery vessels under construction at a Chinese Shipyard for a Singaporean owner. The anchor-handling equipment is scheduled for delivery at the end of 2011 and it will be manufactured at Cargotec’s facilities for offshore load handling in Singapore and China. •        telescopic deck cranes. The anchor-handling towing winches have a 380 tonnes line pull and a 500 tonnes static brake. The bollard pull of these ABS classed vessels is 150 – 160 tonnes.

20 Jan 2011

Lamore World-Wide Oil Spill Response

Lamor oil recovery equipment being deployed during the clean-up efforts. Photo courtesy Lamor Corporation Ab

The April 2010 Gulf of Mexico massive oil spill needed immediate external support, expertise, solutions and equipment to assist in the containment and clean-up efforts. Finnish based Lamor Corporation immediately set its action plans into motion and within 36 hours, through its global network, the company airlifted its arsenal of equipment and key personnel to the scene. The blown-out well on the ocean floor off Louisiana threatened the entire ecosystem in the area as well as the livelihoods of tens of thousands of people at a rate of over 5,000 barrels of leaking crude oil per day.

28 Jan 2010

Sabine-Neches Waterway Open, Limited Traffic

The Unified Command, consisting of the Texas General Land Office, the U.S. Coast Guard and the Eagle Otome's owner, opened the Sabine-Neches Waterway on Jan. 27 to limited traffic after moving the tank vessel Eagle Otome to the Sunoco oil terminal in Beaumont on the evening of Jan. 26. "The Unified Command has been working closely to get the waterway back open as safely as possible," said Coast Guard Capt. J.J. Plunkett, captain of the port and federal on-scene coordinator for the response. Three tugs escorted the Eagle Otome, while two boats carried boom to prevent further spillage and a fire fighting barge was on scene to prevent any fires. Two pilots were on board the ship to further ensure its safe transit to Beaumont.

20 Jan 2004

VT Halter Marine to Conduct MarAd Study

VT Halter Marine Inc. will partner with the U.S. Department of Transportation – Maritime Administration to conduct a feasibility study for the design and manufacture of a dual-use vessel. A dual-use vessel is one that has both commercial and military applications. The four-part study has an estimated cost of $1,224,680, which VTHM will share on a 50/50 basis with the government. It will take approximately 26 weeks to complete the project. VTHM will evaluate known hull forms to help determine the feasibility of a dual-use vessel based on a fast Roll-on Roll-off (RoRo) ferry design.

25 Feb 2004

VT Halter Wins Contract

VT Halter Marine Inc., a subsidiary of Vision Technologies Systems Inc., signed a $5.2 million contract with Tide Leasing Company, L.L.C., of Birmingham, AL to build a stevedoring crane barge. The 200 x 75 x 14.5-ft. foreign flagged vessel will be classed by Lloyd’s Registry Class Designation + 100AN deck barge. Hydralift AmClyde Inc., (AmClyde) will supply the crane for the project. VT Halter Marine plans to complete the barge construction at its Mississippi-based Pascagoula Operations. The scope of work includes installation of the deck winches and crane pedestal and will take about 12 months to comp lete. In the four months that follow, VT Halter Marine will assist AmClyde with the installation and operational testing of the crane.

26 Feb 2004

VT Halter Launches Ferry

VT Halter Marine Inc., a subsidiary of Vision Technologies Systems Inc., launched a 95-foot sea-going ferry from its Mississippi-based Pascagoula Operations. Christened the Caribeña, the all-aluminum vessel was designed and built by VT Halter Marine for the Puerto Rico Port Authority. Capable of carrying 272 passengers, the Caribeña will provide inter- island transportation for the Fajardo-Vieques-Culebra Ferry Line. It will be U.S. Coast Guard classed sub-chapter “K” and U.S. flagged. VT Halter Marine plans to complete and deliver the Caribeña during the second quarter of 2004. It could take 10 or more days to make the 1600- mile trip to the Caribeña’s home at the Port of Fajardo, a city located on the east side of the Island of Puerto Rico.

05 Mar 2004

VT Halter Marine Launches Puerto Rico Ferry

VT Halter Marine Inc., a subsidiary of Vision Technologies Systems Inc., has launched a 95-ft sea-going ferry from its Mississippi-based Pascagoula Operations. Christened the Caribeña, the all-aluminum vessel was designed and built by VT Halter Marine for the Puerto Rico Port Authority. Capable of carrying 272 passengers, the Caribeña will provide inter- island transportation for the Fajardo-Vieques-Culebra Ferry Line. It will be U.S. Coast Guard classed sub-chapter "K" and U.S. flagged. VT Halter Marine plans to complete and deliver the Caribeña during the second quarter of 2004. It could take 10 or more days to make the 1600- mile trip to the Caribeña's home at the Port of Fajardo, a city located on the east side of the Island of Puerto Rico.

09 Mar 2004

VT Halter Marine Moves Corporate Offices

VT Halter Marine Inc., a subsidiary of Vision Technologies Systems Inc., will relocate its corporate office to its Pascagoula Operations in Jackson County, Miss., effective July 1, 2004. VT Halter Marine currently owns six shipyards in Mississippi, two of which are fully operational. Boyd E. King, Chief Executive Officer stated, “With this move, VT Halter Marine will be more integrated and this will position the company for growth and future facilities expansion.” All of the Gulfport-based employees have been asked to relocate to the company’s Pascagoula or Moss Point operations. Executive Director George Freeland Jr. of the Jackson County Economic Development Foundation said…

23 Jun 2004

VT Halter Tapped to Build Two Tugs

VT Halter Marine Inc signed a contract with Lockheed Martin to design and build two harbor tugs. The 30-m Voith Tractor Tugs will be built at VT Halter Marine’s Jackson County, Miss., shipyards with completion scheduled for the fourth quarter of 2005. The two tugs, valued at approximately $18 m, will have all the necessary capabilities to manage and respond to maritime distress. Voith Tractor Tugs have propulsion systems that combine propulsion and steering into a single unit, providing 360 degrees of maneuverability. The tugs will be designed and constructed to comply with the rules and regulations of ABS as well as all applicable international regulations.

26 Jan 2005

VT Halter Marine to Build Three for NOAA

VT Halter Marine, Inc., a subsidiary of Vision Technologies Systems, Inc., will build another Fisheries Survey Vessel for the National Oceanic and Atmospheric Administration. NOAA exercised its option for the third of four planned vessels under an existing contract. This vessel is valued at approximately $38 million. Construction will begin later this year with delivery planned during the second half of 2007. VT Halter Marine designed the 208’ FSVs in accordance with strict guidelines for acoustic quieting set by the International Council for Exploration of the Seas. The first ship in the class—Oscar Dyson—was delivered to NOAA on January 5, 2005 and is one of the most technologically advanced fisheries ships in the world.