Marine Link
Friday, April 19, 2024
SUBSCRIBE

Wgk News

19 May 2016

Wood Group Develops Advanced Analytics Capability with CeADA

Wood Group today announced that it is collaborating with the Centre for Applied Data Analytics (CeADAR), located at University College Dublin (UCD), to launch a new data analytics capability to deliver significant savings for the energy and industrial sectors. Wood Group Kenny (WGK) will work with CeADAR to develop predictive analytics for deployment particularly in the oil and gas industry. This will initially be targeted at brownfield engineering services and will strengthen WGK's existing services in the area of measured data analysis. By tracking the integrity of system components, the service already delivers significant savings to clients through problem detection and optimization, leading to reduced inspection, intervention and maintenance costs.

09 Dec 2015

Wood Group Wins Browse FEED Contract

Wood Group has secured its second front-end engineering design (FEED) contract for the proposed Browse floating liquefied natural gas (FLNG) Development offshore Western Australia. Under the new contract with Woodside, effective immediately, Wood Group Kenny (WGK) will progress the configuration design of the flexible risers and umbilicals for the asset’s offshore gas-condensate fields - Brecknock, Calliance and Torosa. Wood Group commenced a contract earlier this year for the subsea flowline FEED with Woodside for the development, located 300km from the Kimberly coast. Bob MacDonald, CEO of Wood Group Kenny, said: “This second contract…

11 May 2015

OSRCL Inks Maintanence Deal with Wood Group

Wood Group Kenny (WGK) has secured a five year contract with Oil Spill Response (Capping) Ltd (OSRCL) to provide the maintenance support for a key part of a containment toolkit that would be used to control hydrocarbon release in the event of a subsea well control incident. The multi-million dollar project will see WGK work with OSRCL to ensure that the flexible flowlines included in the toolkit are continuously in a condition suitable for immediate load out if mobilised by subscribing oil and gas operators. This will include maintenance management, recommendations for preservation, inspection and testing of all ancillary and lifting equipment, as well as the flexible flowlines, stored at sites in the UK, Singapore and Brazil.

26 Aug 2014

Wood Group Kenny Wins 2 Contracts from Petrobras

Wood Group Kenny (WGK) has won two contracts with a total value of over $2 million with Brazilian operator Petrobras. In the first, WGK has begun a conceptual engineering study of two alternatives of pipeline heating systems for the Petrobras pre-salt Lapa field, water-heated pipe-in-pipe (WH-PiP) and electrically trace-heated pipe-in-pipe (ETH-PiP). The project aims to provide Petrobras and its partners, BG and Repsol Sinopec, with the basis to evaluate the technical feasibility of the south west area tieback on the field and determining the most cost-effective technology. The application of active heating pipeline technology would be a first in a pre-salt environment.

01 Jul 2014

Wood Group Kenny Wins Ghana Contract for Subsea Engineering

Wood Group Kenny (WGK) has been awarded an engineering services contract to support Tullow Ghana Limited and its partners through the execution phase of the Tweneboa, Enyenra and Ntomme (TEN) project, offshore Ghana. WGK will provide subsea, umbilical, risers, flowlines (SURF) engineering services. The Tweneboa, Enyenra and Ntomme oil fields are situated in the Deepwater Tano area, offshore Ghana, approximately 30 kilometres from the existing Jubilee field. Steve Wayman, CEO of Wood Group Kenny said: “We see this as a very significant award from a number of perspectives. We are extremely pleased to be extending our business relationship with Tullow…