Marine Link
Thursday, December 12, 2024

LAD Delivers Dredge Barge

Maritime Activity Reports, Inc.

September 30, 2020

(Photo: TSGI)

(Photo: TSGI)

A 200- by 60-foot walking spud dredge barge built by LAD Services in Louisiana has been delivered to an unnamed client.

LAD contracted The Shearer Group, Inc. (TSGI) to develop the design of the barge which has the capacity to lift 114,000 pounds of dredging spoil. It features two 85-foot-tall removable spuds and one winch operated 85-foot-tall walking spud.

The vessel is equipped with a 43,800-gallon fuel tank and two 24,400-gallon freshwater tanks for unimpeded operation.

The pedestal crane installed is a Liebherr HS 8300 HD crane with a 125-foot-long boom, one of only five in the Americas.

Aboard, there is a full galley, dining area, office, bunks, storage, and workshop for prolonged operations.

The vessel received an ABS Oceans Loadline.

Subscribe for
Maritime Reporter E-News

Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email five times per week