Steel Cut on De Beers Diamond Ship

Maritime Activity Reports, Inc.

May 17, 2019

Photo courtesy of Damen

Photo courtesy of Damen

Damen Shipyards Group and De Beers Marine Namibia (Pty) held a steel cutting ceremony to mark the beginning of construction on a new offshore crawler diamond recovery vessel for offshore operations in Namibia.

At 177 meters (577 feet) long, the new vessel will be slightly larger than the current largest vessel in the De Beers Marine Namibia fleet, Mafuta (174 meters, 571 feet). Built from a Marin Teknikk design, the MT 6027, on-board features include a dynamic positioning system (DP2) based on a seven-thruster propulsion system powered by six generators of 3,230 eKW each.

This is the first time Damen has interacted with De Beers Marine Namibia as clients. De Beers Marine Namibia operates the largest offshore mine in the world, working at a water depth of between 90 and 150 meters off the south west coast of Namibia. The company owns five mining vessels and a dedicated sampling vessel, and additionally charters one sampling/mining vessel.

Damen Shipyards Mangalia will deliver the vessel platform in Mangalia and the vessel will sail on its own keel to Cape Town, South Africa. After the integration of the mission equipment in Cape Town, the vessel is expected to deliver first diamond production in Q2 2022.


Maritime Reporter Magazine Cover Oct 2019 - Marine Design Annual

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Subscribe
Maritime Reporter E-News subscription

Maritime Reporter E-News is the maritime industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News