Related News
Solstad’s Normand Maximus CSV In Line for Two-Year Subsea Work
Solstad Offshore has signed a letter of intent with an international subsea contractor for the charter of construction support…
IEA: Middle East Conflict Reshaping Medium-Term Gas Outlook
The Iran war has already led to a loss of about 120 billion cubic metres of global liquefied natural gas supply over the 2026 to 2030 period, Gergely
U.S. Forces Disable Unladen Tanker Attempting to Violate Blockade
U.S. forces operating in the Gulf of Oman enforced blockade measures by disabling an Iranian-flagged unladen oil tanker attempting…
Baleària Dual-Fuel Fast Ferry Newbuild Aces Sea Trials
Baleària’s new dual-fuel Ro-Pax fast ferry Mercedes Pinto achieved a top speed of 38 knots during sea trials ahead of its…
Sponsored Content
Stop Digitizing the Problem: A Smarter Approach to Maritime Software
The industry is focused on managing cost and maximizing efficiency, so why do some operators resist adopting technology, asks Captain Steve Bomgardner, CEO
Synthetic rope replaces steel wire on deepwater support vessel, changing how crew work on deck
Stabbert Maritime has retrofitted its multipurpose offshore support vessel Ocean Guardian with a synthetic hoisting system after steel wire rope began dictating how and where crew could safely work